Hito Signal

Public records, turned into signals.

Governments publish thousands of decisions every day: permits, tenders, company changes, planning approvals. Almost none of it can be queried. Hito Signal reads it, structures it and tells you what changed.

Every country publishes. Almost nobody can query it.

Gazettes, registries and procurement portals, each with its own format and language, mostly as PDFs. Our engine finds each document, extracts the facts, links them to companies and assets, and keeps the source for every field.

We start where the signal is strongest: energy in Spain.

In 2025, 40 GW of grid access was requested in Spain and 4.5 GW approved. Who gets to build, and where, is decided in resolutions published in the official gazettes. Hito Signal Energy turns them into a feed.

Signals on the globe are examples of what the engine detects. Live today: energy permits in Spain. Projects shown over Spain are real.

Every renewable permit in Spain, structured the day it's published.

Hito Signal Energy collects authorisations, refusals, lapses and grid-access tenders from Spain's official gazettes and turns them into clean English data you can query, join and automate on.

See how one resolution becomes a record
Hito Signal Energy · Spain
Source: BOE, sección III
PFV Volateo Solar139.0 MW, MálagaPreliminary authorisationOlmazo17.7 MW, GuadalajaraConstruction authorisedBCN Solar 1115.1 MW, Lleida and TarragonaDenied: 115 MW released
Signal logNewest first
  1. BOE-A-2026-6533
    BCN Solar 1115.1 MW
    Shell Desarrollo 3 · Lleida and Tarragona
    Denied · capacity released
  2. DGPEM resolution
    Olmazo17.7 MW
    Alfanar Energía España · Guadalajara
    Construction authorised
  3. BOE-A-2023-11177
    PFV Volateo Solar139.0 MW
    Volateo Solar · Málaga
    Preliminary authorisation
Projects on screen3
Capacity tracked271.9 MW
Capacity released115.1 MW

Projects shown are real BOE resolutions. The network is stylised.

From gazette to signal

What happens to one real resolution between the BOE publishing it and your team getting the alert.

  1. Read

    Every morning we read the BOE, fifteen regional gazettes and the Mercantile Registry, and keep the energy records.

  2. Extract

    The decision, promoter, project, capacity, permits and location are identified in the Spanish legal text.

  3. Structure

    Each fact becomes a clean English field, linked to the source document.

  4. Deliver

    The event joins the API and triggers the email alerts you've set up.

BOLETÍN OFICIAL DEL ESTADO20 de marzo de 2026
III. Otras disposiciones
MINISTERIO PARA LA TRANSICIÓN ECOLÓGICA Y EL RETO DEMOGRÁFICO

6533 Resolución de 4 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Shell Desarrollo 3, SLU, de autorización administrativa previa, autorización administrativa de construcción y declaración, en concreto, de utilidad pública de la instalación fotovoltaica BCN Solar 1, de 115,12 MW de potencia instalada, y de su infraestructura de evacuación.

…y su infraestructura de evacuación, en las provincias de Lleida y Tarragona (en adelante, el proyecto).

Event recordBOE-A-2026-6533
event_typeauthorization_denied
promoterShell Desarrollo 3, SLU
permit_typesAAP, AAC, DUP
project_nameBCN Solar 1
capacity_mw115.12
regionCataluña
technologysolar_pv
Permitting eventsUpdated today
2026-03-20BCN Solar 1Shell Desarrollo 3115.1 MWDenied
2024-01-08OlmazoAlfanar Energía España17.5 MWAAP granted
2023-05-11PFV Volateo SolarVolateo Solar139.0 MWAAP granted

The resolution text is quoted from BOE-A-2026-6533.

When a project falls, capacity comes back

Every refusal, lapse or withdrawal can free grid capacity. We flag it the day it's published, so you see it before the market does.

Node view: projects sharing one busbar

Volateo Solar, Olmazo and BCN Solar 1 are real BOE resolutions. The storage project and the shared busbar are illustrative.BOE-A-2023-11177 · BOE-A-2024-435 · BOE-A-2026-6533

What's in the feed

Six datasets built from official sources, each row linked to the document it came from.

Permitting events

Every authorisation, refusal, lapse, withdrawal, environmental assessment and public consultation, with stage, technology, capacity, promoter and location.

BCN Solar 1 denied115.12 MW, Lleida and Tarragona, 20 March 2026

Project pipeline

One row per project with its furthest stage and current status, so you can tell what is moving from what has stalled.

Olmazo17.7 MW, construction authorisation granted

Released capacity

Refusals, lapses and withdrawals flagged the day they're published. Each one can free capacity at a grid node.

115 MW back on the tableafter the BCN Solar 1 refusal

Grid nodes

Every Red Eléctrica transmission node with the access capacity granted, pending and still available, and the projects that connect to it. Screen a node before you file a request.

SET Haza del Sol 30/220 kVOlmazo and the projects sharing its connection

Who is behind it

The company behind each project from the Mercantile Registry: status, corporate directors, sole shareholder and the group that controls it. Changes of holder are often the first sign that a project has been sold.

Olmazo SPV, S.L.new holder of the Olmazo authorisations

Grid access requests

Every access request Red Eléctrica publishes: storage, self-consumption and large consumers such as data centres, with node, position and MW.

Large consumers144 dedicated-demand requests, some 29 GW, from Arcos de la Frontera to Brazatortas

Use it where your data already lives

The same schema across every delivery method. Pick the one your team already uses.

REST APILiveEvents, projects, grid nodes and access requests, filtered by date, stage, technology, region, node or promoter. Read the reference
Email alertsLiveAn email the morning a matching permit, access request or company change is published.
Monthly briefLivePermits, grid capacity and who is behind them, every month. Read the latest
SnowflakeOn requestA secure data share you query next to your own tables.
Webhooks and AIOn requestA call to your system when a matching event lands, or an MCP server for your assistants.
# Projects of 50 MW or more refused or lapsed since 1 November
curl https://api.hitosignal.com/v1/events \
  -H "Authorization: Bearer $HITO_KEY" \
  -G \
  -d event_type=authorization_denied,authorization_lapsed \
  -d min_capacity_mw=50 \
  -d since=2026-11-01
import requests

r = requests.get(
    "https://api.hitosignal.com/v1/projects",
    headers={"Authorization": f"Bearer {KEY}"},
    params={
        "technology": "storage",
        "furthest_stage": "construction_authorization",
        "region": "Andalucía",
    },
)
for p in r.json()["data"]:
    print(p["project_name"], p["capacity_mw"], p["grid_node"])
# Large consumers asking Red Eléctrica for access since September
curl https://api.hitosignal.com/v1/grid/requests \
  -H "Authorization: Bearer $HITO_KEY" \
  -G \
  -d request_type=dedicated_demand \
  -d since=2026-09-01
{
  "event_type": "authorization_denied",
  "stage": "preliminary_authorization",
  "permit_types": ["AAP", "AAC", "DUP"],
  "technology": "solar_pv",
  "project_name": "BCN Solar 1",
  "promoter": "Shell Desarrollo 3, SLU",
  "capacity_mw": 115.12,
  "region": ["Cataluña"],
  "publication_date": "2026-03-20",
  "source_id": "BOE-A-2026-6533"
}

Who uses it, and for what

TeamThe question it answersWhat they use
Infrastructure fundsWhich projects are reaching ready-to-build, who holds them and which portfolios are stalling?Project pipeline, changes of holder, full history for due diligence
Storage and solar developersWhere is grid capacity coming back, and what are competitors filing?Released capacity by node, events by promoter, tender alerts
Data-centre developersWhich substations are crowded, which are freeing up, and which projects sit next to them?Grid nodes, nearby storage and solar projects, demand-access tenders
Manufacturers and EPCsWhich projects are about to order panels, inverters, batteries and transformers?Projects reaching construction authorisation, with promoter and size
Banks and advisorsWhat is the real permitting status of the assets in a deal or a loan book?Event history with links to every official document

One engine for every public record

Energy in Spain is the first signal set. The same engine reads any official source: it finds the document, pulls out the facts, links them to the right company and asset, and tells you what changed.

Signal sets

Pick one to see which sources feed it.

  • Energy · Spain

    Live

    Permits, refusals, lapses, environmental assessments and grid-access tenders

    BOE, fifteen regional gazettes and Red Eléctrica's grid-capacity maps today; Cantabria and Canarias next

  • Public procurement · Spain

    Next

    Tenders, awards and contract changes, linked to the bidding companies

    Plataforma de Contratación del Sector Público

  • Companies and ownership · Spain

    Live

    Directors, shareholders, mergers and insolvency notices for every project company

    BORME, the Mercantile Registry gazette, linked to each project's promoter

  • Planning and real estate

    Planned

    Rezonings, large building licences and land for data centres and logistics

    Regional and municipal gazettes

  • Portugal and Italy

    Later

    The same signals, the same schema, the same API

    Diário da República, Gazzetta Ufficiale

Founding customers decide which signal set we open next.

Official gazettesBOE and regional bulletinsProcurement portalsTenders and awardsCompany registriesBORME noticesGrid operatorsAccess capacity by nodePlanning and landRezonings, licencesOther countriesPortugal, ItalyREST APIJSON, filters, paginationSnowflake shareQuery in your warehouseWebhooks and alertsThe moment it's publishedMCP serverFor your AI agentsMonthly reportPipeline and trends Hitoengine ReadExtractResolveVerify

Every public source, wired to one line

Gazettes, notice boards, registries and the grid operator, read every morning and resolved into one record per project. A closed switch means it is in the feed today. The rest is the map we are wiring next.

Live
19
Connecting
2
On the map
3
Hito engine19 feeds live · one record per project · every morning

National, grid and registries

  • BOELive
    Boletín Oficial del Estado

    Projects above 50 MW, environmental assessments, grid-access tenders

  • REELive
    Red Eléctrica

    Access capacity and requests by transmission node

  • BORMELive
    Mercantile Registry

    Directors and shareholders behind each project company

  • MITECOPlanned
    Environmental assessment

    Scoping and impact studies before they reach a gazette

  • CNMCPlanned
    Energy regulator

    Reports on authorisations and grid-access disputes

  • BOP ×50Planned
    Provincial gazettes

    Town-hall land and building permits for each plant

Regional gazettes · projects of 50 MW or less

  • DOCM · notice boardLive
    Castilla-La Mancha
  • BOJALive
    Andalucía
  • BOCYLLive
    Castilla y León
  • BOALive
    Aragón
  • DOGCLive
    Cataluña
  • DOELive
    Extremadura
  • DOGVLive
    Comunitat Valenciana
  • DOGLive
    Galicia
  • BOCMLive
    Comunidad de Madrid
  • BONLive
    Navarra
  • BOPVLive
    País Vasco
  • BOIBLive
    Illes Balears
  • BOPALive
    Asturias
  • BORLive
    La Rioja
  • BORMLive
    Región de Murcia
  • BOCConnecting
    Cantabria
  • BOCConnecting
    Canarias

Live sources are read every morning, Monday to Saturday. Founding customers decide what we wire next.

Founding-customer pricing

The first ten customers keep this price and help decide what we build next.

10 of 10 founding seats open

Which fits you?
Fits you

Alerts

Manufacturers and EPCs

€290per month
billed yearly

Know the week a project reaches construction, before it orders equipment.

Try the alerts free
  • Email alerts and the monthly brief
  • 12 months of history
  • REST API(not included)
  • Grid capacity and access requests by node(not included)
  • Snowflake data share and webhooks(not included)
  • Who is behind each project (BORME)(not included)
Fits you

Feed

Developers, data centres, advisors

€1,200per month
billed yearly

Every event the day it's published, wherever your team works.

Start a 14-day trial
  • Email alerts and the monthly brief
  • History since January 2025
  • REST API
  • Grid capacity and access requests by node
  • Snowflake data share and webhooks(not included)
  • Who is behind each project (BORME)(not included)
Fits you

Enterprise

Infrastructure funds

Customsized to your
portfolio

The full history in your warehouse, with who owns what.

Talk to us
  • Email alerts and the monthly brief
  • History since January 2025
  • REST API
  • Grid capacity and access requests by node
  • Snowflake data share and webhooks
  • Who is behind each project (BORME)

Prices in euros, before VAT. Every plan starts with a free 14-day trial and the 2025 dataset.

Common questions

7 questions

Something else? Write to hello@hitosignal.com. A person answers, usually the same day.

From Spain's official gazettes: the Boletín Oficial del Estado (BOE) for state-level projects above 50 MW, and the regional gazettes for everything smaller: fifteen of the seventeen regions today, from Castilla-La Mancha (DOCM and the Junta's notice board), Andalucía, Castilla y León, Aragón and Cataluña to Madrid, Navarra, the País Vasco, the Balearic Islands, Asturias, La Rioja and Murcia. Cantabria and the Canary Islands are next. The companies behind each project come from the Mercantile Registry gazette (BORME), and grid capacity and access requests from Red Eléctrica. Every record links to the original document.

The same day. The gazettes publish each morning, and new events reach the API and your email alerts that morning. Red Eléctrica's grid capacity updates monthly, as it publishes.

It's public and legally reusable, but scattered across 18 gazettes as Spanish legal PDFs. We read, structure, translate and link it so your team doesn't have to.

Those are authorised by the regions, so they never reach the BOE. Fifteen of the seventeen regions are live. Since January 2025 they add more than 3,000 renewable projects, some 25 GW, that appear only in the regional gazettes, almost all of them 50 MW or less and many under 5 MW. Cantabria and the Canary Islands are next.

No. We structure information about projects and companies only. Annexes listing affected landowners are never extracted.

No. Energy in Spain is the first signal set because demand is urgent and the sources are rich. Procurement and company ownership come next, on the same engine and API.

Yes. Start a 14-day trial: you get your API key on the spot and a daily email alert, plus the full 2025 dataset. No card needed. The API reference has everything you need to start.

Get every 2025 permitting decision, free

  • Projects, events and released capacity
  • Excel, CSV and JSON, in English
  • Every row linked to its official source
  • Plus a 14-day trial: your own API key and a daily email alert
Technologies Optional: all if you pick none

Data controller: the owner of Hito Signal, identified in the legal notice. Purpose: sending you the dataset, running your trial (API key and alerts) and, with your consent, news about the service. Your data is stored in the EU and never sold. You can access, correct or delete it by writing to hello@hitosignal.com. Details in our privacy policy.

Request receivedSaved. Here is your record.
  1. Request savedJust now
  2. 2025 datasetPreparing…
  3. Trial API keyReply to our email and we'll set one up for your team.